Customization: | Available |
---|---|
Certification: | CE, ISO |
Condition: | New |
Still deciding? Get samples of US$ 7320/Set
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
This machine is used for the second sealing of insulating glass, silicone and polysulfide rubber coating.
Main Features
1.The curing agent is provide with a filter device,high pressure safety protection device in the pipe line,to ensure the operating more safety.
The system is a closed system, put an end to the air and aviod curing agent contacting with the air and curing, to ensure that the media flow stability.
2.The high pressure valve of base material pump,curing agent pump and proportional pump adopt zero leakage of special alloy gringing,has a unique and convenient adjustableproportioning mechanism,
ensure the bi-component sealant almost harsh ratio requirements.
3.The mixing system used precision stainless steel mixer,mixing mangrel,with the specially designed unidirectional needle valve,to ensure the mixing evenly.
Techinical Data
Model |
JYT-03 |
Mixing ratio |
6:1-14:1 |
Material drum |
55 gallon(200L) |
Curing agent drum |
5 gallon(20L) |
Max.air consumption |
0.8m³/min |
Max.dispensing pressure |
30Mpa |
Output |
4-10L/min |
Air supply pressure |
0.6~1.0Mpa |
Outside dimension |
1100*950*1980mm |
Weight |
650Kg |
Before payment
Free contact for the most suitable machine
Free professional design for each customer especially.
After sale service
24 hours technical support by phone, email or skype (email or skype) .
1years warranty period
Our senior engineer is available to travel aboard, help the installation, maintenance and training staff.
By offering this support, we make sure the cutomer start the business smoothly, to realise win-win cooperation.
Payment
♦ L/C, 30% deposit by T/T,70% spare payment L/C.
♦ T/T, 30% deposit by T/T,70% spare payment before shipment.
♦ Western Union or Paypal.
FAQ
1. When can we arrange shippment?
We usually arrange shippment within 15 days after getting deopsit,
but customized machines should be more than 25 days.
2.What you can do if my machines have problems?
1) We can send you free components to you if your machines are in guarantee time.
2) We can send our engineers to repair your machines
3.Do you provide equipment operation training?
A: Yes. We can send professional engineers to the working site for equipment installation, adjustment, and operation training. All of our engineers have passport.
4. If I make insulating glass, how many basic machines do i need?